Huilacollo

Overview and Highlights


The Huilacollo epithermal property is comprised of 3300 hectares of intense hydrothermal alteration that is consistent with epithermal Au/Ag mineralization over a 4 by 6 km area. Contigious to the Huilacollo property are the Tacora and Andamarca properties, which the company acquired in August 2017. Auryn’s technical team believes the epithermal system on the Tacora licenses is the continuation of the same oxide gold epithermal system observed on the Huilacollo licenses. The Andamarca license provides Auryn with a strategic land position that is considered important from an infrastructure standpoint if future mining were to occur.

Location & Infrastructure


The Huilacollo property has excellent infrastructure with access by road, nearby high voltage power lines and water.

Project Geology


Historical drilling has outlined a mineralized zone that is open for expansion along a 4km north-south trending corridor. Table 1 below highlights historical intercepts:


Table 1: Huilacollo selected intercepts

Hole IDFromToIntervalAu
g/t
Ag
g/t
Au g/t*
meters
AM-14082.582.51.166.595.6
AM-13062620.9412.158.1
AM-13128146181.044.318.7
AM-06088881.059.092.1
AM-16082820.9918.580.9
AM-01080801.2911.8103.2
AM-02050.6550.651.249.363.0
HU-35.4539.45342.1422.172.9
Intercepts were calculated using a minimum of a 0.2 g/t Au cut off at beginning and end of the intercept and allowing for no more than four meters of less than 0.2 g/t Au. True widths of the reported intercepts are believed to be approximately 60% of the drilled widths.


Higher grade zones within the mineralized zone appear to be focused along well defined feeder structures as highlighted by trench intercepts up to 38m at 6.7g/t Au and drill holes including 34m @ 2.14g/t. Importantly, the mineralization as currently defined, represents less than 10% of the area of first order geophysical targets defined by overlapping high resistivity and low chargeability zones that represent the potential for oxide gold mineralization within silica bodies. Initial exploration work will focus on rapidly establishing drill targets through structural mapping, trenching, volumetric sampling, and multi-spectral analysis with an initial drill program planned for the fourth quarter of 2016.

Sulphidation Alteration System
Sulphidation Alteration System
Sulphidation Alteration System
Huilacollo Technical Report
Huilacollo Technical Report
Huilacollo Technical Report
Historical Drilling
Historical Drilling
Historical Drilling
Oxide Gold Targets
Oxide Gold Targets
Oxide Gold Targets

Ownership


The Company acquired the rights to the Huilacollo property through an option agreement with a local Peruvian company, Inversiones Sol S.A.C. (the “Huilacollo Option”). Under the Huilacollo option, the Company may acquire a 100% interest, subject to a NSR, through a combination of work expenditures and cash payments as detailed in the table below.

The Tacora and Andamarca concessions were acquired in two seperate transactions with private Peruvian owners. Under the terms of the Tacora acquisition agreement, the Company will pay US $200,000 on signing of the Public Deed transferring the concessions in favor of Corisur Peru SAC. The Tacora concessions are subject to a 0.5% NSR, 50% of which is buyable for US $0.5 million. Under the terms of the Andamarca acquisition agreement, the Company will pay US $450,000 on signing of the Public Deed transferring the concession in favor of Corisur Peru SAC. The Andamarca concession is subject to 1.5% NSR, 50% of which is buyable for US $2.5 million.

Due datesProperty PaymentsWork Expenditures
All amounts in US dollars
Effective Date (May 31, 2016)$ 250,000-
Within 24 months of the Effective Date$ 500,000$ 2,000,000
Within 36 months of the Effective Date-$ 3,000,000
Within 48 months of the Effective Date$ 250,000-
Within 60 months of the Effective Date$ 250,000$ 2,000,000
Within 72 months of the Effective Date$ 7,500,000-
Total$ 8,750,000$ 7,000,000

The Huilacollo NSR is 1.5% and buyable for $2,500,000 on precious metals and 2.5% buyable for $7,000,000 on base metals.

Cautionary Wording with Respect to the Mineral Interests

Auryn holds its interests in Peru through Corisur Peru SAC, which controls (among other) certain licenses (including the Huilacollo and Baños del Indio projects) that are located within a special legal zone which runs 50km back from the Peruvian border. As a non-Peruvian company, Auryn’s right to ultimately acquire title over the shares issued by Corisur Peru SAC and to own and/or exploit these licenses requires approval from the Peruvian government. While Auryn is in the process of submitting its applications with respect such the approval and does not currently foresee any legal reason why it would be denied the approval, some risk of denial or delay should be assumed to exist.